biohazard-vfx/docs/stories/checks/1.4.validation.md
nicholai ed55376b9c
Some checks are pending
Build and Push to Docker Hub / Push Docker image to Docker Hub (push) Waiting to run
Build and Push Docker Image / build-and-push (push) Waiting to run
bmad-planning-complete
2025-09-24 10:54:01 -06:00

24 lines
849 B
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

Story Draft Checklist — 1.4 Projects Section Revamp
1. Goal & Context Clarity
- PASS — Clear outcomes for index and detail; media wrapper goal set.
2. Technical Implementation Guidance
- PARTIAL — Solid file guidance. Reel source relies on `siteAsset` keys; define exact key(s) and fallback sequence.
3. Reference Effectiveness
- PASS — Direct file paths; mapping to existing fields documented.
4. Self-Containment Assessment
- PASS — No schema changes; filters on inmemory list; edge cases called out.
5. Testing Guidance
- PASS — IV checks, lazy media, SEO preservation.
Final Assessment: NEEDS REVISION (minor)
- Clarity score: 8/10
- Issues:
- Specify reel asset priority: try `projects.reel.video``projects.reel.embed``projects.hero.image`.
- Confirm filter UX defaults (initial tab, default category/year).